By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
AIT LIVEAIT LIVEAIT LIVE
  • Live TV
  • Politics
  • National News
  • Business
  • Sports
  • Tech
  • Entertainment
  • Global
  • Videos
Font ResizerAa
Font ResizerAa
AIT LIVEAIT LIVE
Search AIT
  • Live TV
  • Politics
  • National News
  • Business
  • Sports
  • Tech
  • Entertainment
  • Global
  • Videos
Follow US

Enugu Air Overshoot Runway At Benin Airport Due To Safety Gaps – NSIB

Last updated: August 22, 2026 4:44 pm
2 months ago Amarachi Amushie
Share
2 Min Read
AIT IMAGES 2 49

Nigerian Safety Investigation Bureau, NSIB, has identified multiple safety gaps at Benin Airport in Edo State, South-South Nigeria following the July 23 runway excursion involving an Enugu Air flight.

According to the preliminary report, the crew knew before landing that the aircraft’s autobrake system was unavailable and planned to use manual braking. But the landing was also affected by a wet runway, rain, reduced visibility and tailwind.

The flight data recorder showed a tailwind of about 12 knots at the runway threshold and 6.4 knots at touchdown. The aircraft touched down approximately 1,641 metres from the threshold of Runway 05 at about 138 knots before overrunning the runway.

NSIB says the aircraft struck approach-lighting equipment and two concrete structures linked to a decommissioned localiser installation. All 68 occupants evacuated safely, with no injuries reported.

Beyond the aircraft and crew, the preliminary report identified concerns with runway-condition reporting, weather information and control-tower visibility. NSIB noted that although the crew was told the runway was wet, no Runway Condition Report or Runway Condition Code was communicated during the reviewed air traffic control exchanges.

MUST READ: ICPC Investigates For More Facts About Fake Agency In SGF”s Office

The bureau also found that the airport’s weather information display was unserviceable, while an incomplete structure obstructed the control tower’s view of part of the aerodrome.

NSIB has issued four immediate recommendations, including the removal of fixed structures beyond Runway 05, improved tower visibility, provision of a suitable tower location for NAMA, and restoration of the weather information display by NiMet.

NSIB says the findings are preliminary, as investigations continue into the aircraft’s performance, crew decisions, runway conditions, weather and airport infrastructure.

(Follow AIT News on WhatsApp, AfricaIndependentTV on YouTube, ait_online on Facebook and X (Formerly Twitter), and officialait on TikTok, Instagram and Threads)

(Editor: Terverr Tyav)

Share This Article
Facebook Twitter Whatsapp Whatsapp Email Print

RSS feed: Unknown Feed Unknown Feed

Trending

FG
FG Plans National Digital Farmers Data Register
Headlines
ADP LOGO
ADP CRISIS: Presidential Candidate Accuses Party Chairman of Sabotage
Politics
WhatsApp Image 2025 12 25 at 1.40.13 PM
Delta Governor On Crime Fighting
Africa
AIT IMAGES 31
Niger Mining Deaths: Group demands independent probe, accountability
Local
ait images 3 1
FG Ready To Negotiate New Minimum Wage In 2027
Local

Section

  • Headlines
  • Local
  • Business
  • Politics
  • Sports
  • Crime
  • Education
  • Health
  • Entertainment

Programmes

  • Kakaaki
  • Focus Nigeria
  • Democracy Today
  • People Politics and Power
  • News Hour
  • AIT Reports
  • World News
  • Moneyline With Nancy
  • Jigsaw

About Us

  • About AIT
  • Our History
  • Our Awards
  • Our Values
  • Privacy Policy


Follow US
© AIT.LIVE. All Rights Reserved.
Join Us!

Subscribe to our newsletter and never miss our latest news, podcasts etc..

THE MOST IMPORTANT NEWS HEADLINE AND EVENT OF THE DAY

Subscribe to our mailing list to receive daily news update direct in your inbox!

Zero spam, Unsubscribe at any time.
Welcome Back!

Sign in to your account

Lost your password?